logo

Shenzhen CPET Electronics Co., Ltd. eng39@szcpet.com 86-0755-23427658

Shenzhen CPET Electronics Co., Ltd. Company Profile
products
Home > products > Automated Burn In Test Solutions > Automatic Aging Test Equipment For Photovoltaic Inverter Energy Storage Power Supply

Automatic Aging Test Equipment For Photovoltaic Inverter Energy Storage Power Supply

Product Details

Place of Origin: China

Brand Name: CPET

Certification: CE

Model Number: CPET-ME200006T

Payment & Shipping Terms

Minimum Order Quantity: 1

Price: 46800 Dollar

Packaging Details: Wooden box packaging

Delivery Time: 60day

Payment Terms: T/T

Supply Ability: 2 sets / month

Get Best Price
Product Details
Highlight:
Use:
Automatic Aging Test For Photo Storage Products
Use:
Automatic Aging Test For Photo Storage Products
Product Description
Automatic Aging Test Equipment For Photovoltaic Inverter Energy Storage Power Supply

Scope of application

Automatic Aging Test Equipment For Photovoltaic Inverter Energy Storage Power Supply 0

LED power supply, new energy OBC, PC power supply, server power supply, TV power
supply, photovoltaic inverter, high-power industrial power supply, etc

Outstanding functions

Automatic Aging Test Equipment For Photovoltaic Inverter Energy Storage Power Supply 0

1. Fully automatic operation

2. More stable and reliable

3. Automatic high pressure test, ATE test, burn-in test

4. Unit design, specific configurationcan according to customer needs 

5. Save labor, reduce labor intensity

6. Integration testing no need to turn over, improve degree of automation 

7. Multiple test station, save space, real-time monitoring, has the functions such as
abnormal alarm stop

8. Burn-in test interface independent, for your follow-up maintenance,keep quality and
save cost

9. Load recovery efficiency up to 80%6, reduce load electricity heat, reduce the electrical waste

10. Powerful versatility, DC products with or without wires can be applied, and the operation
 is simple and convenient

11. Use a large number of robots or transfer machines to replace labor, with high efficiency,
increasing your company's production efficiency by up to 50%

Performance parameters

Automatic Aging Test Equipment For Photovoltaic Inverter Energy Storage Power Supply 0

Basic information Model Equipment Model CPET-ME200006T
Units Per Hour(UPH) 120PCS/h
Product Power 30KW/CH
Equipment Size L=12400mm,W=4900mm,H=3000mm
Equipment Weight Around 13000kg
Related Information
of Burn-in line
Burn-in Room Capacity 60PCS
Burn-in Time 2H
Burn-in Ply Number 3 floors
Transfer mode Modular splicing manipulator handling
Burn-in Line Temperature
Control system
Cooling Circulation Mode Forced air cooling:fan+frequency convertwe+air duct
Control Scope and Precision The temperature control scope:adjustable from room temperature to 60°C.The control precision is ±5°C
Temperature Rise Rate Able to rise to more than 45°C in 20 minutes
Burn-in Line Electronic
Control system
Product and Load Properties Optional
Load Properties Optional
Burn-in Voltage Input Support up to 6 voltages
Protection and Alarm Control power supply independently and added with protection and equpment including overheating and
overload protection,earth leakage circuit breaker,waring light,emergency switch,etc
Hardware Demand Description Independent computer host, display burn-instate, monitor output should be voltage, current,power and soon
Software Monitor Demand Compile different Burn-in programs according to different products, realize voltage switching, impact, switching
cycle, current setting, temperature setting and other parameters
Burn-in Management Demand The OK and NG judgment monitoring interface can directly understand that the data can be saved according to
the required data format (TXT, EXCEL), which is convenient for query and download
Test Station Related
Information
Test Station Types Install the product + electrified initial test + high voltage + ATE + Burn-in + ATE + take the product, automatic test
Burn-in system, Unit combination system
Test Mode Optional
Test Data Processing Optional
Test Instruments Optional
Connection Mode Optional
Burn-in & Test Jig Jig Size W1000mm*D1000mm*H70
Interface Mode AC: Anderson terminal; DC: Anderson terminal
The Commmon Usage Shared by burn-in and test
Weight 35KG
Main Electric Control System Protection Equipment Possessing independent and segmentation main switches.Having independent ground protection and electricity
leakage protection devices
Power Demands According to the actual planning
Air source requirements 0.5-0.8MPa