Brief: Discover the 100kW EV Charger Burn In Chamber, a robust test system designed for portable DC charging piles. This advanced burn-in chamber ensures reliable performance with features like automatic smoke alarms, multi-laminate structures, and uninterrupted testing for other piles if one fails. Perfect for high-power EV charger testing.
Related Product Features:
Transfer cables connect products with AC input/output equipped with acquisition modules.
Multiple laminate structures available to suit different product requirements.
AC parameter measurement module allows adjustable input specifications.
Built-in automatic smoke alarm protection for enhanced safety.
Continuous testing of other charging piles unaffected if one fails.
System includes 1 control cabinet, 2 burn-in cabinets, and 4 trolleys.
Total input power of 100kW with three-phase five-wire system 220Vac.
Materials comply with UL 94V0, Rohs, WEEE, and IEC62368 standards.
Faqs:
What is the total input power of the 100kW EV Charger Burn In Chamber?
The total input power is 100kW, with a three-phase five-wire system 220Vac.
How does the system handle a failure in one charging pile during testing?
The system can automatically bypass the faulty charging pile and continue testing others without interruption.
What safety standards does the burn-in chamber comply with?
The chamber meets UL 94V0, Rohs, WEEE, and IEC62368 international safety standards.